Module 4 · Cloud & DevOps Engineer Capstone: Ready for the Sale
Delivery and the change freeze
Measure Kasuwa's delivery with the four DORA measures, find which deploys fail most often, and set evidence-based rules for deploying before and during the sale.
About 25 minutes
The problem
"Every deploy feels like a gamble," says the head of engineering, and the product team wants to ship new sale features up to the last minute. Some engineers want a total freeze for a month; others say freezes just pile up risk for afterwards. Six months of deployment records (deployments.csv) can settle it.
The concept
The four DORA measures
| Measure | Question |
|---|---|
| Deployment frequency | How often do we ship? |
| Lead time for changes | How long from a change being ready to it being live? |
| Change failure rate | What share of deploys cause a failure (rolled back or hotfixed)? |
| Time to restore | When a deploy fails, how long until service is restored? |
What makes a deploy risky?
Compare failure rates by the deploy's features: whether the change had automated tests, how big it was, when it was deployed. Small groups give noisy rates, so count the deploys behind each one.
A freeze with evidence
A freeze is a trade-off. It removes deploy risk during the sale, but changes pile up and land together afterwards. A short freeze around the sale, with rules that cut risk in the weeks before, usually beats a long one.
Example
The four measures:
import pandas as pd
base = "https://academy.cloudtechanalytics.com/datasets/platform/"
deploys = pd.read_csv(base + "deployments.csv", parse_dates=["deployed_at"])
deploys["failed"] = deploys["result"] != "Success"
weeks = (deploys["deployed_at"].max() - deploys["deployed_at"].min()).days / 7
print(f"Deploys: {len(deploys)} in {weeks:.0f} weeks ({len(deploys) / weeks:.1f} a week)")
print(f"Median lead time: {deploys['lead_time_hours'].median():.0f} hours")
print(f"Change failure rate: {deploys['failed'].mean():.1%}")
print(f"Median time to restore: {deploys['minutes_to_restore'].median():.0f} minutes")Deploys: 167 in 25 weeks (6.6 a week)
Median lead time: 29 hours
Change failure rate: 14.4%
Median time to restore: 36 minutesKasuwa deploys often and restores quickly, but about one deploy in seven fails. Which ones?
deploys["late_friday"] = (deploys["deployed_at"].dt.dayofweek == 4) & (deploys["deployed_at"].dt.hour >= 15)
deploys["size"] = pd.cut(deploys["lines_changed"], [0, 100, 400, 100_000], labels=["under 100 lines", "100 to 400", "over 400"])
for col in ["has_tests", "late_friday", "size"]:
print(deploys.groupby(col, observed=True)["failed"].agg(deploys="size", failure_rate="mean").round(3), "\n")deploys failure_rate
has_tests
0 48 0.208
1 119 0.118
deploys failure_rate
late_friday
False 150 0.120
True 17 0.353
deploys failure_rate
size
under 100 lines 63 0.095
100 to 400 84 0.179
over 400 20 0.150Deploys without automated tests fail far more often than those with them. Late-Friday deploys fail most of all, though there are few of them, so treat that rate as a warning rather than a precise figure. Small changes (under 100 lines) fail least, at under 10%. Larger ones fail at 15 to 18%, so keep sale-period changes small.
The rules that follow from the evidence:
- From now on: every checkout change needs automated tests to deploy, changes should be small, and no deploys after 15:00 on Fridays.
- Two weeks before the sale: only changes with tests, with a named reviewer from the payments team.
- Sale week: freeze, except fixes approved by the incident lead, each with a tested rollback.
- After the sale: release the queued changes in small batches, not all at once.
Walkthrough
- Run the cells.
- Calculate the four measures for each service. Is checkout better or worse than the others?
- Estimate the change failure rate if every deploy had tests. How many failures would that have avoided in six months?
- Look at the deploys that took longest to restore. Were they rolled back or hotfixed?
- Write the deployment policy for the sale (the task below).
Practice
Practice
What is the change failure rate over the six months? One decimal place.
Practice
What is the change failure rate for deploys without automated tests? One decimal place.
Task
8 minWrite the deployment policy for the sale (60 to 150 words): the DORA figures today, the evidence behind each rule, the freeze window and its exceptions, and what happens after the sale.
Your work is checked for
- Gives DORA figures
- Covers tests
- Covers Friday deploys
- Defines the freeze and exceptions
- Covers exceptions (fixes, incident lead, approved)
- Says what happens after (small batches)
- Between 60 and 150 words
Check your understanding